J.P. Bussell
J.P. Bussell is a drilling rig with drilling contractor ARO Drilling. Status reported in other terms. Last reported in Saudi Arabia by Valaris — fleet status report (SEC 8-K exhibit), report dated 2026-08-05.
As of the contractor's report dated 2026-08-05 (106 days ago).
Contract timeline
Dates as stated by the source; month-precision dates run to the end of the month. An option is not a commitment and may not be exercised. Nothing here says a contract is in force today.
Sign in free to see contract dates, well history and the exact position.
Reported location
Country only: Saudi Arabia, as reported by the contractor on 2026-08-05. The marker is placed at a reference point for that country, not the rig's position. 27.000, 50.000, observed 2026-08-05. Source: Valaris — fleet status report (SEC 8-K exhibit).
Sign in free to see contract dates, well history and the exact position.
Equipment (RigDNA)
Equipment appears only when a source documents it. Suppliers and contractors can send a published rig specification to [email protected].
Specifications
- Design
- LT Tarzan 225-C
- Rated water depth
- Not stated
- Year built
- Not stated
- Specification source
- Valaris — fleet status report (SEC 8-K exhibit), report dated 2026-08-05
Well history and drilling permits
Sign in free to see contract dates, well history and the exact position.
Related rigs
Questions about J.P. Bussell
Where is J.P. Bussell?
Valaris — fleet status report (SEC 8-K exhibit) last reported J.P. Bussell in Saudi Arabia on 2026-08-05. This is a reported location, not live tracking.
Which drilling contractor runs J.P. Bussell?
ARO Drilling is reported as the rig's contractor by Valaris — fleet status report (SEC 8-K exhibit) (report dated 2026-08-05).
Sources
- Valaris — fleet status report (SEC 8-K exhibit) (status report dated 2026-08-05; reported position). Captured 2026-11-07
Source-reported information; not live tracking or a compliance determination. Positions are reported locations, not live tracking. See Data and sources.