Arabia II
Arabia II is a jack-up rig with drilling contractor Borr Drilling. Operating (contractor report). Last reported in United Arab Emirates by Borr Drilling — fleet status report (SEC 6-K exhibit), report dated 2026-08-11.
As of the contractor's report dated 2026-08-11 (100 days ago).
Contract timeline
Dates as stated by the source; month-precision dates run to the end of the month. An option is not a commitment and may not be exercised. Nothing here says a contract is in force today.
Sign in free to see contract dates, well history and the exact position.
Reported location
Country only: United Arab Emirates, as reported by the contractor on 2026-08-11. The marker is placed at a reference point for that country, not the rig's position. 24.800, 53.500, observed 2026-08-11. Source: Borr Drilling — fleet status report (SEC 6-K exhibit).
Sign in free to see contract dates, well history and the exact position.
Equipment (RigDNA)
Equipment appears only when a source documents it. Suppliers and contractors can send a published rig specification to [email protected].
Specifications
- Design
- KFELS B Class
- Rated water depth
- 400 ft
- Year built
- 2019
- Specification source
- Borr Drilling — fleet status report (SEC 6-K exhibit), report dated 2026-08-11
RigDNA: equipment and capability
Specifications as stated by each source on its stated date. Not verified, converted or inferred. Borr states its specification sheets are for general reference purposes only. The date shown is the date of the PDF file.
| Item | As stated | Source | Date on source | Captured |
|---|---|---|---|---|
| Design | Keppel FELS B Class | Borr Drilling — rig specification sheets (PDF) | file date 2026-10-21 | 2026-11-16 |
| Builder yard | Keppel FELS shipyard | Borr Drilling — rig specification sheets (PDF) | file date 2026-10-21 | 2026-11-16 |
| Year entered service / upgrades | Nov 2019 | Borr Drilling — rig specification sheets (PDF) | file date 2026-10-21 | 2026-11-16 |
| Class society | ABS, A1 Self-elevating Drilling Unit | Borr Drilling — rig specification sheets (PDF) | file date 2026-10-21 | 2026-11-16 |
| Flag | Liberia | Borr Drilling — rig specification sheets (PDF) | file date 2026-10-21 | 2026-11-16 |
| Item | As stated | Source | Date on source | Captured |
|---|---|---|---|---|
| Rated water depth | 400ft. | Borr Drilling — rig specification sheets (PDF) | file date 2026-10-21 | 2026-11-16 |
| Drilling depth | 30,000 ft, 30,000ft | Borr Drilling — rig specification sheets (PDF) | file date 2026-10-21 | 2026-11-16 |
| Hookload | 1,500,000lbs. static hook load capacity. | Borr Drilling — rig specification sheets (PDF) | file date 2026-10-21 | 2026-11-16 |
| Derrick height | Lee C Moore; 160ft high with a 36ft. x 36ft base. | Borr Drilling — rig specification sheets (PDF) | file date 2026-10-21 | 2026-11-16 |
| Cantilever reach | 70ft. aft of transom, 15ft. port / 15ft. stbd | Borr Drilling — rig specification sheets (PDF) | file date 2026-10-21 | 2026-11-16 |
| Variable deck load | 6,850 kips, 6,850kips operating | Borr Drilling — rig specification sheets (PDF) | file date 2026-10-21 | 2026-11-16 |
| Item | As stated | Source | Date on source | Captured |
|---|---|---|---|---|
| Top drive | NOV TDS-8SA 750 ton hoisting capacity, with a 1,150 hp AC motor rated to 62,500ft.-lbs continuous drilling torque Maximum speed of 270 rpm and an intermittent torque of 95,000ft.- lbs. | Borr Drilling — rig specification sheets (PDF) | file date 2026-10-21 | 2026-11-16 |
| Drawworks | NOV ADS-10T, (3) AC motors 1,150 hp each. Rated to 750 st with 14 lines of 1- 5/8" drilling line. | Borr Drilling — rig specification sheets (PDF) | file date 2026-10-21 | 2026-11-16 |
| Mud pump | 3 x NOV 14-P-220 2,200hp triplex pumps, each driven by 2x 5GEB 22D AC motors. Rated to 7,500 Psi | Borr Drilling — rig specification sheets (PDF) | file date 2026-10-21 | 2026-11-16 |
| BOP ram | 2 x Cameron double RAMS 13-5/8" 10,000 psi BOP | Borr Drilling — rig specification sheets (PDF) | file date 2026-10-21 | 2026-11-16 |
| BOP annular | 1 x Hydril 13-5/8" 5,000 psi annular preventer. | Borr Drilling — rig specification sheets (PDF) | file date 2026-10-21 | 2026-11-16 |
| Rotary table | NOV RST-495. 49 ½” hydraulic rated at 1,500 kips. | Borr Drilling — rig specification sheets (PDF) | file date 2026-10-21 | 2026-11-16 |
| Crane | 1 x Seatrax 7232, main hoist 70MT at 62ft radius with 130ft boom length. 2 x Seatrax 7232, main hoist 70MT at 62ft radius with 120ft boom length. | Borr Drilling — rig specification sheets (PDF) | file date 2026-10-21 | 2026-11-16 |
| Pipe handling | 1 x NOV AR3200M Roughneck, (1) NOV PH 100 Pipehandler | Borr Drilling — rig specification sheets (PDF) | file date 2026-10-21 | 2026-11-16 |
| Power generation | 5 x Caterpillar 3516C-HD diesel engines rated at 2,150 hp, at 1200 rpm, with (5) Baylor Generator rated 1,720 KW 600V 60Hz | Borr Drilling — rig specification sheets (PDF) | file date 2026-10-21 | 2026-11-16 |
| Solids control | 5 x VSM 300 shale shakers. (1) Brandt Hydrocyclones | Borr Drilling — rig specification sheets (PDF) | file date 2026-10-21 | 2026-11-16 |
Well history and drilling permits
Sign in free to see contract dates, well history and the exact position.
Related rigs
Questions about Arabia II
What type of rig is Arabia II?
Arabia II is a jack-up rig (KFELS B Class), according to Borr Drilling — fleet status report (SEC 6-K exhibit) (report dated 2026-08-11).
Where is Arabia II?
Borr Drilling — fleet status report (SEC 6-K exhibit) last reported Arabia II in United Arab Emirates on 2026-08-11. This is a reported location, not live tracking.
Which drilling contractor runs Arabia II?
Borr Drilling is reported as the rig's contractor by Borr Drilling — fleet status report (SEC 6-K exhibit) (report dated 2026-08-11).
When was Arabia II built?
2019, according to Borr Drilling — fleet status report (SEC 6-K exhibit) (report dated 2026-08-11).
What water depth is Arabia II rated for?
400 ft, according to Borr Drilling — fleet status report (SEC 6-K exhibit) (report dated 2026-08-11).
Sources
- Borr Drilling — fleet status report (SEC 6-K exhibit) (status report dated 2026-08-11; reported position). Captured 2026-11-05
Source-reported information; not live tracking or a compliance determination. Positions are reported locations, not live tracking. See Data and sources.